12,000 hoursGen 1 field hours
-
3generations, closed loop
-
1machine torn down · 34 points
-
2 year2,000 hourwarranty — stand-on loader
Generations
— the closed-loop record
Three generations of the stand-on loader platform. The excavator line (ZEWEIT X through ZEWEIT 9) enters the same archive system from its first fleet data — see Section 03. The generational story below is the loader’s own; we publish it because it is the honest way to show how a machine gets reliable.
-
2022–2023GEN 1 · SV25H
— Foundation platform48 field reports per year at peak. The machine that taught us everything. Exports through the legacy site.12,000 hoursSV25H fleet, 2022–2023,
all markets -
2024–2025GEN 2 · DIWAL X
— 7 components redesignedEvery Gen 1 failure mode closed before launch. Field reports fell to 14 per year.48→14→8field reports/year · 2023→2024
→2025 · per 100 units·month -
2026+GEN 3 · DIWAL X TURBO
— Carries every closed-loop changeSame verified structure, turbo power unit. 8 field reports per year, normalized.7→0failure modes closed · 0
recurrence to date
| Failure Mode | Occurrences | Root Cause | Design Change | Since Fix | Evidence |
|---|---|---|---|---|---|
| Throttle cable fracture (pull-type) | 7 · 2023 | Cable fatigue under cyclic load | Push-pull cable assembly | 0 incidents | EV-2023-07 |
| Boom drift / uncontrolled descent | 1 · safety | No load-holding valve in lift circuit | Load-holding valve added | 0 incidents | EV-2023-22 |
| Cylinder rod bending | 3 | Rod / OD undersized for rated load | Cylinder OD & rod diameter increased | 0 incidents | EV-2023-31 |
| Return filter loosening (incl. one batch) | 3 · batch | Assembly torque unverified | Torque QC checkpoint + fastening marks | 0 incidents | EV-2024-03 |
| Fuel filler corrosion | 2 · 2024 | Ungalvanized filler components | Galvanized components + reinforced weld process | 0 incidents | EV-2024-11 |
| Battery terminal clearance | 2 · 2024 | Assembly sequence risk | Assembly process redesign + clearance spec | 0 incidents | EV-2024-17 |
| Hose chafing at frame routing | 2 · 2024 | Missing abrasion protection at contact points | Routing clamps + sleeve protection at all contact points | 0 incidents | EV-2024-24 |
2-year/2,000-hour
Warranty — stand-on loader platform (all generations). Compact excavators: 5 years. Full terms at Pricing & Warranty. This archive’s warranty scope is the stand-on loader platform; excavator visitors should not read this as a 2-year-all-lines figure.
| Evidence ID | Case Summary (anonymized) | Anonymized Case ID | Corrective Notice | Verification Hours |
|---|---|---|---|---|
| EV-2023-07 | Pull-type throttle cable fractured under cyclic load on 7 units (2023). Root cause confirmed by fatigue analysis. Redesigned to push-pull assembly before Gen 2 launch. Zero recurrence since. | QA-2023-C07 | CN-2023-C07-REV0 | 9,400 h |
| EV-2023-22 | Single safety-relevant event: boom drift under load from a lift circuit without load-holding valve. Valve added across the boom circuit; design change verified on customer machines. Zero recurrence. | QA-2023-C22 | CN-2023-C22-REV0 | 11,200 h |
| EV-2023-31 | Three cylinder rod bending events traced to rod/OD undersized for rated load. Diameters increased; structural check re-run against rated + 25% overload case. Zero recurrence. | QA-2023-C31 | CN-2023-C31-REV0 | 8,700 h |
| EV-2024-03 | Return filter loosening including one production batch. Assembly torque was unverified. Torque QC checkpoint with fastening marks added to the line. Zero recurrence. | QA-2024-C03 | CN-2024-C03-REV0 | 12,400 h |
| EV-2024-11 | Fuel filler corrosion on early-build units in coastal markets. Galvanized filler components and reinforced weld process introduced. Zero recurrence. | QA-2024-C11 | CN-2024-C11-REV0 | 6,300 h |
| EV-2024-17 | Battery terminal clearance insufficient in one assembly sequence. Process redesigned and a clearance specification added to the QC sheet. Zero recurrence. | QA-2024-C17 | CN-2024-C17-REV0 | 5,800 h |
| EV-2024-24 | Hydraulic hose chafing at two frame routing points. Routing clamps and sleeve protection added at all contact points, reflected in the harness drawing. Zero recurrence. | QA-2024-C24 | CN-2024-C24-REV0 | 5,100 h |
What “closed” means
- Root cause identified and documented — not “adjusted”, redesigned.
- Design change verified by field hours, not lab hours alone.
- Recurrence tracked to zero before the row is marked PREVENTED.
What we never do
- Rename a failure mode to sound softer. Same word as the QA ledger.
- Publish a “fixed” claim without its Evidence ID.
- Show internal states (Proposed / Agreed) on this board.
Teardown
— one machine,
measured
Serial SVMX1141NL1357. Shipped November 2022. 12,4XX hours of tree-care and landscaping work in the U.S. Southeast. We bought it back, tore it down, and measured everything — 34 inspection points, unedited readings.
-
94%Points within spec — 32 of 34 within wear limits
-
12,4XXTotal hours
-
34Inspection points
-
2022.11Ship date (EXW)
| # | Inspection Point | Design Value | Measured | Wear Limit | Result |
|---|---|---|---|---|---|
| 07 | Boom pin-to-bush clearance | 0.08–0.20 mm | 0.19 mm | ≤ 0.40 mm | IN SPEC · 47% USED |
| 11 | Track pitch elongation | ≤ 2.0 % | 1.6 % | ≤ 3.0 % | IN SPEC · 53% USED |
| 19 | Pump volumetric efficiency | ≥ 92% (new) | 89.4 % | ≥ 85 % | IN SPEC · SERVICEABLE |
| 23 | Boom weld MT examination | No indications | No indications | PASS | |
| 28 | Swing gear backlash | 0.30–0.60 mm | 0.55 mm | ≤ 1.20 mm | IN SPEC · 42% USED |
Fleet Stats
— live numbers from the field
Updated quarterly from the service ledger. Where a denominator is still being built, we say so — no number is published without its counting rule. The fleet registry covers both product lines: the stand-on loader (all generations) and the ZEWEIT excavator range (X · Y · Z · 3 · R · 6 · 9), tracked since 2026-09.
-
184,3XXCumulative fleet hours
— telemetry + service returns,
all generations, both lines -
2.1Field reports / 100 units·mo
— rolling 12 months, all models -
—First-Time-Fix Rate — data collection started 2026-09 · first publishable value 2027-Q2
-
—Time-to-Part (median) — pipelining with Parts SLA · first value 2027-Q2
| Quarter | Field Reports / 100 units·mo | Note |
|---|---|---|
| 2023 Q4 | 5.8 | — |
| 2024 Q2 | 3.9 | — |
| 2024 Q4 | 2.9 | — |
| 2025 Q2 | 2.4 | — |
| 2025 Q4 | 2.1 | Latest |
| 2026 Q4 | Pending |
—
Publishing “—” with a start date and a first-value date is a statement: we would rather show an honest blank than a number without a denominator. The blanks convert to values on schedule, in public view.
Known Issues
— the same four states we use internally
Our internal quality tracker uses four states: PROPOSED → AGREED → SOLVED → PREVENTED. Only issues that reached Solved or Prevented appear on this board. The board refreshes every quarter.
| Issue | Status | Root Cause & Fix | Evidence |
|---|---|---|---|
| Throttle cable fracture | PREVENTED | Pull-type cable fatigued under cyclic load → push-pull assembly, introduced Gen 2. | EV-2023-07 |
| Boom drift / uncontrolled descent | PREVENTED | Missing load-holding valve → valve added to boom circuit, Gen 2. | EV-2023-22 |
| Cylinder rod bending | PREVENTED | Rod / OD undersized for rated load → diameters increased, design change. | EV-2023-31 |
| Return filter loosening (incl. one batch) | PREVENTED | Assembly torque unverified → torque QC checkpoint + fastening marks. | EV-2024-03 |
| Fuel filler corrosion | PREVENTED | Ungalvanized components → galvanized filler + reinforced weld process. | EV-2024-11 |
| Battery terminal clearance | PREVENTED | Assembly sequence risk → process redesign + clearance spec added. | EV-2024-17 |
| Hose chafing at frame routing | PREVENTED | Missing abrasion protection → clamps + sleeves at all contact points. | EV-2024-24 |
NOT PUBLISHED — MONITORING
Pump-drive coupling wear. An item under monitoring exists internally. It will appear on this board only after reaching Solved with verification hours. Cross-generation items without a closed loop never enter the published board.
Board status: 7 PREVENTED · 0 open-published. Every published item carries its Evidence ID, its verification hours, and its closed-loop row — no exceptions.
The DA Dictionary
Stable entries, frozen anchors. DA-001 – DA-010. Product-page durability claims carry an Evidence ID that resolves into this archive. Entry IDs never change and never get reused — same discipline as the MET, FT, TRC, CRT and MR dictionaries.
| Code | Term | Definition |
|---|---|---|
| DA-001 | Evidence ID | Format EV-YYYY-NN, mapped one-to-one from the QA ledger 3.0 anonymized case ID. The frontend assigns no IDs by hand. One ID, one case, forever. |
| DA-002 | Four-State Vocabulary | Proposed / Agreed / Solved / Prevented — the exact words of the internal tracker. Only Solved and Prevented are publishable states; the other two are technically blocked from appearing in any query result. |
| DA-003 | Closed-Loop Row | A published row must contain five elements: occurrences, root cause, design change, field result since fix, Evidence ID. Missing any element means the row waits — it is never published partial. |
| DA-004 | Normalization | Field report counts are normalized per 100 units·month before any trend is drawn. Raw counts without denominators are never shown. Definition lives on the Methodology page — one fact, one home. |
| DA-005 | Verification Hours | A redesign is verified by field hours on customer machines, tracked per case. Lab hours alone do not close a loop. |
| DA-006 | Honest Blank | Where a denominator is still being built, the cell shows “—” with the collection start date and the first publishable date. Blanks convert in public view, on schedule. |
| DA-007 | Audit Stamp | Every page carries: verified date, ledger version, next refresh quarter. The stamp is fed from one site-level source — four views, one definition. |
| DA-008 | Quarterly Refresh | The archive refreshes every quarter on a published calendar. If a refresh is late, the stamp says so — the same on-schedule discipline as the Monthly Report. |
| DA-009 | No Marketing Renaming | Failure mode names on this site are copied verbatim from the QA ledger. The frontend has no authority to soften, shorten, or translate terminology for persuasion. |
| DA-010 | Scope | The archive covers the stand-on loader platform (all generations) and the ZEWEIT excavator range. New series (articulated loader, EINKE electric line) enter the same system at first fleet data — by rule, not by exception. |
Presentation Rules &
Refresh Pipeline
Four laws, six red lines, five pipeline steps. The rules that keep the archive from decaying into marketing.
The four presentation laws
- Claim → evidence, one hop. Every durability claim on a product page shows its Evidence entry within reach, landing on an anchored, highlighted table row.
- Data is the hero. No product photography in the archive — monospaced readings are the visual protagonist. Photography persuades; readings settle accounts.
- The audit stamp never leaves. Verified date + ledger version on every view.
- Internal wording = published wording. Zero renaming between tracker and site.
Hard red lines
- R1 — Proposed / Agreed items cannot render on the site. The filter is structural, not editorial.
- R2 — No published row without an Evidence ID.
- R3 — No trend without a stated denominator.
- R4 — Component and supplier names in claim cases are anonymized to category level.
- R5 — Audit stamp fed from one site-level source; page version and ledger version are bound.
- R6 — Quarterly refresh is calendared; a late refresh is announced, not hidden.
-
Ledger export
QA ledger 3.0 → fixed-column JSON, version incremented -
Import
Quarterly script writes evidence items & teardown points -
Dual sign-off
Brand + Quality both sign before publish -
Publish
Four views update together; stamp refreshes -
Archive
Prior version preserved in the Archive (ARC ledger)
Boundaries &
Mount Points
Where the archive plugs in. Assertions stay on the product page; evidence lives here. This archive answers one question: what broke, and what did we do about it.
| Mount point | Behavior |
|---|---|
| Product page — DIWAL X TURBO | “3rd-Generation Proven Reliability” label links to #gen; “12,000 hours of field verification” links to the Teardown view; “7 failure modes, 0 recurrence” links to the anchored closed-loop row. Assertions stay on the product page; evidence lives here. |
| Legacy site — Gen 1 pages | Top notice on legacy Gen 1 product pages: “This model is Generation 1. See what we changed since.” pointing to this archive. |
| Excavator product pages | ZEWEIT pages link to Fleet Stats until excavator-specific teardowns exist — the registry section covers both lines. No excavator durability claim publishes ahead of its data. |
| Anchor deep links | /transparency/reliability/#ev-2023-07 — target row scrolls into view and flashes highlight. |
| Sibling pages | Counting definitions → Methodology (MET). Warranty terms → Pricing & Warranty. Operating heartbeat → Monthly Report (MR). Compliance status → Certification (CRT). This archive answers one question: what broke, and what did we do about it. |
Version History
Master index of all transparency pages lives in the Archive (ARC). Version numbers bind to ledger versions at publish time.
| Version | Date | Date |
|---|---|---|
| v1.0 | 2026-08-30 | Initial publication structure: four views (Generations / Teardown / Fleet Stats / Known Issues), DA-001 – DA-010 dictionary, presentation laws and red lines, site wiring. Values illustrative pending QA ledger 3.0 batch-1 backfill. |